Slope Formation Analysis
As part of the Hong Kong Hospital Authority’s 10-year Hospital Development Plan, a new acute block is being constructed adjacent to an existing hospital. To facilitate as much space as possible for the new acute block, some of the existing...
Read moreSite Survey and Slope Topography Assessment
For this project, aerial photogrammetry and point cloud capture were combined with ground-based LiDAR scanning to accurately model the current structural outline, and underlying topography of this location on the south west of Hong Kong Island. The consulting engineers...
Read moreConstruction Progress Modelling
For this major construction project on the south side of hong Kong island, precise, detailed orthomosaic maps and 3D models were captured and generated on an ongoing basis to monitor and assess slope formation and foundation work. The tight...
Read more